In his CM: the Next Generation series, Joe Farah gives us a glimpse into the trends that CM experts will need to tackle and master based upon industry trends and future technology challenges.

Summary:
Building is considered to be one of the fundamentals of configuration management, even though some might argue that building isn't really CM. The reason it is fundamental is that the build/verification cycle provides proof of reproducibility if done correctly. It forces CM to be done correctly so that only the objects from the CM repository are used to reproduce the build. When formal build processes are correct, they need no information that resides outside of a CM repository. When properly done, the build record is created prior to the build (i.e., a build notice) rather than as a result of the build, with that record being used to drive the build process. An integral change management capability is an essential component of such a build process.

Pages

About the author

Joe Farah's picture Joe Farah

Joe Farah is the President and CEO of Neuma Technology and is a regular contributor to the CM Journal. Prior to co-founding Neuma in 1990 and directing the development of CM+, Joe was Director of Software Architecture and Technology at Mitel, and in the 1970s a Development Manager at Nortel (Bell-Northern Research) where he developed the Program Library System (PLS) still heavily in use by Nortel's largest projects. A software developer since the late 1960s, Joe holds a B.A.Sc. degree in Engineering Science from the University of Toronto. You can contact Joe at farah@neuma.com

AgileConnection is one of the growing communities of the TechWell network.

Featuring fresh, insightful stories, TechWell.com is the place to go for what is happening in software development and delivery.  Join the conversation now!

Upcoming Events

Nov 09
Nov 09
Apr 13
May 03