In his CM: the Next Generation series, Joe Farah gives us a glimpse into the trends that CM experts will need to tackle and master based upon industry trends and future technology challenges.

CM Manager

  • Build progress (e.g., Gantt chart)
  • Problems addressed by a build (as compared to the previous build or a reference build)
  • Features added by a build (as compared to a previous/reference build)
  • Changes that have gone into a build (as compared to previous/reference build)
  • Test run summary against builds for this release
  • Changes ready for integration by product stream
  • Summary of newly added/moved/deleted files for this release
  • Build pair specification for comparison of two specific builds

In looking at these three roles, along with the dashboard items that might be posted on a given dashboard, it becomes apparent that additional context can be used to automatically guide the dashboard generation. Whereas the product was the only context for a typical product manager query, an easier to use next generation system should allow a much wider variety of context specification. For example, the project manager should be able to specify the current project (and/or release) of interest, and the dashboard items should focus in on that project.  Also, the CM manager, in addition to the release context, should be able to specify a build or perhaps a pair of builds (i.e., for comparison purposes) for which arbitrary queries and dashboard presentations should be generated.

For role-based dashboards, an ideal situation is where the context variables are control widgets for the rest of the dashboard display.  The project manager might be able to scroll through a set of projects. The CM manager might be able to compare the current state of the product to specific builds that customers are currently using.  Or perhaps s/he should be able to scroll through builds in historical order and see the set of problems/features/changes, etc. in summary and line detail formats.  Such a capability really helps to eliminate the need for the user to learn where things are in menus.  A dashboard comes up and the manager can quickly and intuitively navigate through projects, releases, builds, etc., and then zoom-in on details.

As the requirements of the role are better understood for a given project, company or release state, it would be even more ideal if the dashboards could be tailored by the managers themselves, perhaps by selecting potential dashboard components from a checklist, or having the capability to adjust the parameters of specific components to their preferences.

The goal of proper dashboard configuration, if the CM tool allows it, should be to ensure that each role has all of the information necessary to do the job of that role, without having to ask for special reports or even search through the menus for them.

About the author

Joe Farah's picture Joe Farah

Joe Farah is the President and CEO of Neuma Technology and is a regular contributor to the CM Journal. Prior to co-founding Neuma in 1990 and directing the development of CM+, Joe was Director of Software Architecture and Technology at Mitel, and in the 1970s a Development Manager at Nortel (Bell-Northern Research) where he developed the Program Library System (PLS) still heavily in use by Nortel's largest projects. A software developer since the late 1960s, Joe holds a B.A.Sc. degree in Engineering Science from the University of Toronto. You can contact Joe at farah@neuma.com

AgileConnection is one of the growing communities of the TechWell network.

Featuring fresh, insightful stories, TechWell.com is the place to go for what is happening in software development and delivery.  Join the conversation now!

Upcoming Events

May 04
May 04
May 04
Jun 01