Small Teams in a Large Organization


requirements for these teams over and above those already in place are generally modest. As always, the SCM tool chain(s) should be set up to be as self-administering and low maintenance as possible. Specialized integration between the SCM tools, project metrics, data mining, etc. should be kept to a minimum over what is already in place unless a new methodology is to be tried . Whenever considering new tools , integrations or customizations, ROI should be considered. 

About the author

AgileConnection is a TechWell community.

Through conferences, training, consulting, and online resources, TechWell helps you develop and deliver great software every day.